Tuesday, April 11, 2017

Springtime means Party Time!!



We have been wanting to gather this group together for awhile and show them the renovation progress.  Sunday was such a pretty, perfect day.  Just the right conditions for wine and snacks lakeside, followed by a tour of the house.  So fun to have folks interested in our future home!

Lots of exciting things happened late last week.  Steve was able to get the rest of our bedroom and master bathroom windows in, Lenny snuck in on Saturday morning and did some more brickwork on the dining room chimney, and Joel worked hard all day on Sunday building a retaining wall on the west side of the house.  We are throwing all sorts of green waste as well as old bricks and stones behind the wall.  Soon Joel will have several loads of fill dumped over the trash pile, then eventually he will have some nice topsoil dumped on top of that.  We will plant grass and wildflowers and make this side yard very pretty.








Thursday, April 6, 2017

Could it be a Sign??


Well it most certainly is...the one that I painted last summer and placed down at our beach.  All ruined now due to very high waters.  Our friend Ron visited us and the house on Sunday and after a tour of the renovation progress, we all took a walk down to the lake.  We were very surprised to find the water level had risen almost all the way up to the steps of our deck.  Currently we have no beach.  Let's look at this as a positive sign though; plentiful water is a good thing!

It feels like we are moving at warp speed on the house lately.  Mark continued placing  electrical outlets and switches over the weekend to stay caught up with Steve who is a whirling dervish.  The framing around the dining room fireplace is now complete.  The 7 windows in the peak of the master bedroom went in today, and plans to install the in-floor radiant heat are almost complete.  The plumbers will be doing their thing soon, and Raulli's Iron Works is constructing our upper deck.  Can't wait to see what next week brings!









Saturday, April 1, 2017

Upstairs, Downstairs....


Every time I stopped in at the house this week I had a hard time finding Steve!  He was up.  He was down.  Once he was even in the attic!  So many different loose ends came together, and several odd jobs got finished.  Enjoy as I take you through the progress...

drop down attic stairs installed in front bedroom closet
3 risers now in place between master bedroom and yoga/closet room
half wall going up in master bedroom
framing for window in the peak of the master bedroom ceiling
pantry floor in place






Wednesday, March 29, 2017

Stunning Results!


Cathy and I finished the chair re-upholstery project (well, really she did all the work and I just keep us well fed!)  I could not be more pleased with the finished product.  It will be great fun to move them to their new home on the lake along with us, the dogs, and all our other stuff. 



Tuesday, March 28, 2017

Let there be Lights!

Mark has been working diligently to get all the wiring done on the house, both inside and out.  We only have a few more rooms to discuss the placement of boxes and switches.  Joel and I went up at dusk last evening, and it was so comforting to see lights on in the upstairs bedrooms.



In the meantime, Lenny continues to beautify the dining room fireplace.  I absolutely love his redo of the bread oven!  We caught Steve just in time last night to talk about the mantle.  Now is the time to insert it above the existing bricks before Lenny continues his work upwards.  The three of us went down into the basement and picked out a gorgeous old board from the house that will be perfect once Steve trims it down a bit.


Steve has framed out our closet, and secured the roof in that room to the new rafters.  All good!


I will post more exciting news and pictures as the week goes on so check back soon:)













Wednesday, March 22, 2017

Stella had nothin on Steve!

Last Wednesday evening Joel and I had plans to drive down to Emerald Isle, NC for a long weekend getaway.  Then came winter storm Stella who dumped over 2 feet of snow on the whole northeast over the course of one day, Tuesday.  She was predicted to continue on into Wednesday, so we moved up our departure time during her lull, which was in the wee hours of the morning.  Before we left, Joel plowed out the house so Steve could get to work if he so desired.  He showed up!  He took this picture which shows the fresh blanket (or should we call it a down comforter?) of snow on the roof right outside our bedroom window.


We are back now, and Steve asked if I could come up to the house yesterday as he and the crew had some questions.  So exciting to see all that was accomplished in our absence!  Mark continues to put in switches and electrical boxes all over the house.  Quite a task and done so efficiently and quickly.  He ran into some issues with lack of space in the upstairs bathrooms, so instead of installing vent/heat/and light units we decided to do only light and vent and find a heat source elsewhere...perhaps in the floor?  Lenny was also "in the house."  The new chimney side and front walls that he is creating are spectacular!  He also shored up all the bricks inside the flue as far up as he could reach so that if down the road Joel and I decide to fix the flue from the roof down we will be able to have real fires.  I requested that we keep the original brick in place on the south side of the chimney and expose it for all to see.  Steve has finished framing out our bedroom and master bath windows.  Things are really moving along:)












Saturday, March 11, 2017

Moving from Back to Front (or front to back if you are of Joel's mindset!)


Steve has completed the installation of the roof rafters in the Yoga Room!  Also, he has put up one collar tie; the other will be placed once we determine the exact measurement of the closet.  Right now the entire roof is just sitting on the walls of the room because as Steve placed the new rafters he removed the old, and the original attachment is now gone.  He has temporarily secured the roof down at strategic places until he and Joel decide how to best solve this new challenge.  Luckily the roof is very heavy...it is actually a roof built upon a roof, so we don't think it is going to shift or move.  However, it has been incredibly windy lately:)



Joel and I go back and forth on which is the front of the house and which is the back.  He considers the lakeside the front because he calls it "lakefront."  I think that the front of the house is the side that faces the street, you know the side with the "front" door?!  In any event, while Steve waits for Lenny to come back and finish the dining room chimney repair so he can build the kitchen walls, he has moved to the front part of the upstairs (I am sticking with my definition of front!) and built the walls for our reading room as well as the closet walls for each of the front bedrooms.



The absolute nicest thing happened late yesterday!  After Joel and I met with the owner of a local heating and cooling company who presented his proposal for our job, we headed over to my parents house for happy hour.  My dad had asked us to fill them in on what the plan was because he knew we were struggling with which way to go...forced hot and cool air, radiant heat in the floors, or base board heating and ducted cooling.  Well, were we ever in for a big surprise.  My folks offered to cover the entire cost of the HVAC installation!  We accepted with hugs all around.  Quite the happy hour indeed.  Thank you so much mom and dad!  Oh, and we have decided to go with baseboard heating, ducted cooling, and an AC mini-split to cool the Yoga and Rustic rooms.