Turning Up the Heat


Steve and company have dived right into their in-floor radiant heating project up at the house.  Most of the materials are there, ready to be installed, but more boxes of manifolds and Pex tubing were just delivered today by FedEx.  Do I sound like I know what I am talking about?  Hardly!  But I try to learn something new every day:)  Here's the weekly rundown...Steve has got Larry back helping him out.  They are boring holes in the floor joists of both levels so that they can run the Pex tubing which will eventually carry warm water all throughout the house to keep us toasty in the winter.  There are a couple of spots that are going to be hard to get to because there is no basement underneath; just a crawlspace.  Steve will figure it out I am sure! 





Meanwhile, Spike has returned from Florida and is recreating both our front and back stoops in his masterful, mason way.  Once he is done outside he plans to freshen up the den fireplace brickwork and the hearth as well.  Lenny still needs to finish the dining room fireplace and hearth.  I understand that should happen next week!


Finally, Raulli's Ironworks came up with the bolts that they plan to install on the lakeside wall to support the upper deck.  Steve bored the holes in the two large vertical beams and began to trim around the area so that the bracket can be put up next week.








Tuesday, April 11, 2017

Springtime means Party Time!!



We have been wanting to gather this group together for awhile and show them the renovation progress.  Sunday was such a pretty, perfect day.  Just the right conditions for wine and snacks lakeside, followed by a tour of the house.  So fun to have folks interested in our future home!

Lots of exciting things happened late last week.  Steve was able to get the rest of our bedroom and master bathroom windows in, Lenny snuck in on Saturday morning and did some more brickwork on the dining room chimney, and Joel worked hard all day on Sunday building a retaining wall on the west side of the house.  We are throwing all sorts of green waste as well as old bricks and stones behind the wall.  Soon Joel will have several loads of fill dumped over the trash pile, then eventually he will have some nice topsoil dumped on top of that.  We will plant grass and wildflowers and make this side yard very pretty.








Thursday, April 6, 2017

Could it be a Sign??


Well it most certainly is...the one that I painted last summer and placed down at our beach.  All ruined now due to very high waters.  Our friend Ron visited us and the house on Sunday and after a tour of the renovation progress, we all took a walk down to the lake.  We were very surprised to find the water level had risen almost all the way up to the steps of our deck.  Currently we have no beach.  Let's look at this as a positive sign though; plentiful water is a good thing!

It feels like we are moving at warp speed on the house lately.  Mark continued placing  electrical outlets and switches over the weekend to stay caught up with Steve who is a whirling dervish.  The framing around the dining room fireplace is now complete.  The 7 windows in the peak of the master bedroom went in today, and plans to install the in-floor radiant heat are almost complete.  The plumbers will be doing their thing soon, and Raulli's Iron Works is constructing our upper deck.  Can't wait to see what next week brings!









Saturday, April 1, 2017

Upstairs, Downstairs....


Every time I stopped in at the house this week I had a hard time finding Steve!  He was up.  He was down.  Once he was even in the attic!  So many different loose ends came together, and several odd jobs got finished.  Enjoy as I take you through the progress...

drop down attic stairs installed in front bedroom closet
3 risers now in place between master bedroom and yoga/closet room
half wall going up in master bedroom
framing for window in the peak of the master bedroom ceiling
pantry floor in place






Wednesday, March 29, 2017

Stunning Results!


Cathy and I finished the chair re-upholstery project (well, really she did all the work and I just keep us well fed!)  I could not be more pleased with the finished product.  It will be great fun to move them to their new home on the lake along with us, the dogs, and all our other stuff. 



Tuesday, March 28, 2017

Let there be Lights!

Mark has been working diligently to get all the wiring done on the house, both inside and out.  We only have a few more rooms to discuss the placement of boxes and switches.  Joel and I went up at dusk last evening, and it was so comforting to see lights on in the upstairs bedrooms.



In the meantime, Lenny continues to beautify the dining room fireplace.  I absolutely love his redo of the bread oven!  We caught Steve just in time last night to talk about the mantle.  Now is the time to insert it above the existing bricks before Lenny continues his work upwards.  The three of us went down into the basement and picked out a gorgeous old board from the house that will be perfect once Steve trims it down a bit.


Steve has framed out our closet, and secured the roof in that room to the new rafters.  All good!


I will post more exciting news and pictures as the week goes on so check back soon:)













Wednesday, March 22, 2017

Stella had nothin on Steve!

Last Wednesday evening Joel and I had plans to drive down to Emerald Isle, NC for a long weekend getaway.  Then came winter storm Stella who dumped over 2 feet of snow on the whole northeast over the course of one day, Tuesday.  She was predicted to continue on into Wednesday, so we moved up our departure time during her lull, which was in the wee hours of the morning.  Before we left, Joel plowed out the house so Steve could get to work if he so desired.  He showed up!  He took this picture which shows the fresh blanket (or should we call it a down comforter?) of snow on the roof right outside our bedroom window.


We are back now, and Steve asked if I could come up to the house yesterday as he and the crew had some questions.  So exciting to see all that was accomplished in our absence!  Mark continues to put in switches and electrical boxes all over the house.  Quite a task and done so efficiently and quickly.  He ran into some issues with lack of space in the upstairs bathrooms, so instead of installing vent/heat/and light units we decided to do only light and vent and find a heat source elsewhere...perhaps in the floor?  Lenny was also "in the house."  The new chimney side and front walls that he is creating are spectacular!  He also shored up all the bricks inside the flue as far up as he could reach so that if down the road Joel and I decide to fix the flue from the roof down we will be able to have real fires.  I requested that we keep the original brick in place on the south side of the chimney and expose it for all to see.  Steve has finished framing out our bedroom and master bath windows.  Things are really moving along:)