Saturday, December 17, 2016

Our New Floorplans are Underway

Winter is definitely upon us, and Steve is working inside full time now.  He has created a workstation upstairs to cut boards for all the framing that needs to be done.  Our two bathrooms, with a spacious hallway separating them, are beginning to take shape which is very exciting because I can now start to place the sinks and toilets etc. in the spaces (well, at least mark them with little slips of paper!)  Since Paige has been home for the holiday season we head up to the house every day to see what new progress has been made.  She enjoyed testing out the guest room shower:)


You will notice that the stall seems little, and it is...36" by 36," but that is because this room is going to feature a spectacular oval whirlpool soaking tub that takes up quite a bit of floor space.


This angled wall mimics the one that was already there.  Steve just made it longer and moved it back several inches, thus keeping the cool slant where I plan to place a pedestal sink and mirror in our master bathroom.  The space in the background where the boards are piled up is my future laundry room.


Steve is also working on the Yoga Room.  Joel and I decided to grab some space from the west side of the room and have Steve create a large walk-in closet that we can share.  As he prepared to move the existing wall and build a new one further into the room, the roof began to sag.  Steve knew this was going to happen and is not concerned so I will not worry either!






No comments:

Post a Comment