The sun came out yesterday as evening approached. It had been pretty much of a washout until then. After working HARD all weekend long, both inside and out, we decided to celebrate the holiday with good friends. Everyone contributed something to either eat or drink, and we basked in the excitement of showing off all the progress that has been made at the house lately. It took a few minutes to reign in this gang for the group photo!!
Steve announced on Friday that he and his team have finished running the PEX tubing (1 mile of it, in fact!). The last few feet were difficult because Steve had to squeeze underneath the floor of the dining room to complete the installation. Guess he drew the short straw! Joel made several runs out to his Dad's on Saturday with the truck and the trailer for more dirt. After dumping and spreading it all across the front of the house, he seeded it then laid on some straw. I mowed the entire back and side lawns. We moved piles of wood from different parts of the property and stacked it under the side porch area. We swept and vacuumed the entire house and removed any excess debris to get it ready for the dump. Joel began to plan out the road he is going to build down to the lake. He prepped and stacked most of the wood that he will be using for the forms.
Today starts another busy week. Hopefully the plumbing will begin and the air conditioning will be completed. Stay tuned:)
No comments:
Post a Comment