Saturday, October 14, 2017

Now we are rockin!


Joel and I were away at a conference for almost a week during which time the spray foam guys finished their job and Steve and Larry and Mark tidied up all the loose ends (electrical and carpentry) inside in preparation for the sheet rocking team.  Steve sent me these photos of the sheet rock being delivered on Thursday, all 18,000 square feet of it!




Matt, the foreman of the sheet rock team, had already laid out a plan of how many sheets were to be delivered to each room, and the most obvious way to get them to the upper level was through an open window!


I took photos of all the boards in all the rooms, but I do not want you to be bored  (haha) with all of them so here is a sample shot:)



And finally...today, Saturday, the guys came and started hanging the wall boards.  They worked from early morning till dusk and got almost the entire second floor done.  We couldn't be more pleased!!